anchor line

英 [ˈæŋkə(r) laɪn] 美 [ˈæŋkər laɪn]

锚线;拉线;锚索

机械



双语例句

  1. UML practice is to anchor a note to another model element with a dashed line when appropriate& with the note attached to the message.
    UML实践是在适当的时候将一条注释加入另一个带有虚线的模型元素&带有附加到消息中的注释。
  2. Divers on Monday installed a fresh anchor line on the ferry to enter from a new point, Mr. Ko said.
    潜水员周一在船上安装了新的锚索,准备从一个新的入口进入。
  3. He had been a valet, and a hospital orderly, and a cook, and for many years was a table steward on the Anchor Line.
    他当过侍仆,当过医院里的看护,当过厨师,还在锚线号船上餐厅里当过多年的侍者。
  4. The storm drove the ship forward shearing its anchor line and setting it adrift. I gave one desperate pull at the taut tow-rope to bring the boat alongside.
    暴风雨刮动着船,绷断了缆绳,使船只飘浮无依。我拼命拉住那根绷紧的缆绳,想把小艇拉过来。
  5. The ground anchor truck our company provided is used for quick screw-in and out operation of fixed guy line ground anchor in oil field.
    我公司供给的地锚车,用于油田流动绷绳用地锚的快速拧入拧出功课。
  6. In the course of constructing reversed pendent hole, the strict measures were used in boring hole, surveying degree of inclined line, correcting its error, and installing protective steel tube, anchor, the line of perpendicular, and buoy.
    倒垂孔施工过程中,对钻孔及纠偏,孔斜检测,保护管安装及埋设,锚块、垂线安装及埋设,浮体组安装等,均采取了严格的技术措施;
  7. Analysis on Superheat for Anchor Clamp of 220 kV Transmission Line
    220kV输电线路耐张线夹过热原因分析
  8. The prestressing anchor line construction of the high slope of the barge lift of three gorge project and the analysis of the monitoring data
    三峡工程升船机高边坡预锚施工与监测成果分析
  9. The harness has been developed from retaining wall and cantilever pile to the light-retaining structures such as prestressed anchor line.
    人们采用的治理措施从重力挡土墙、悬臂抗滑桩等被动受力结构向以预应力锚索抗滑支挡结构为代表的具有主动受力机制的轻型支挡结构发展。
  10. This article describes the development process and study procedure for the anchor production line of hardening and tempering, and thermal treatment, and its production technology.
    概述了锚链调质热处理生产线及生产工艺的开发过程和研究方法,并对该设备和工艺的特点作了简介。
  11. Phi-side slope in the dam within the Department in accordance with the corresponding pressure, light bags dam design parameters, using non-parallel to the anchor line layout dam bags, more conducive to raise dam, dam collapse, more economical and reasonable.
    并在坝端斜披处按照相应内压,参照坝袋设计参数,采用非平行锚固线布置坝袋,更加有利于升坝、坍坝,更加经济合理。
  12. By comparing with testing data, accuracy of anchor calculation program of dynamic broken line model and pile calculation program in self-anchored test was measured.
    再次,通过与实测数据对比,验证了基桩自锚测试工作性状计算程序的准确性。
  13. Anchor piles was commonly used in foundation support designs at present, but the construction of anchor often beyond the red line, so it brings hidden danger to construction of underground in the future.
    现阶段基坑支护设计中,桩锚是较普遍的支护方式,但是锚杆的施工往往越出了红线,给未来的地下施工带来了隐患。